Planning a basement renovation in Kitchener? OM Precision Services turns unfinished or dated basements into rooms your family uses every day. We check for moisture first, then frame, insulate, drywall, floor and finish, with the city permit planned into the schedule. One local crew and a clear written estimate.
Get your free basement estimate
Tell us about your basement and we will call you to book a visit.
Free, no-obligation estimate. We never share your details.
A basement in Waterloo Region sits below ground through freeze and thaw, spring melt and heavy rain. A finished basement only lasts if it is planned around that.
Before we frame a single wall, we look for signs of moisture: staining on the foundation, efflorescence, damp corners and the condition of the floor. If water is getting in, that has to be fixed before anything is covered up. Then we plan the layout around your furnace, water heater, beams and ductwork, so the space feels open, ceilings stay as high as possible and the mechanical room is still easy to reach.
From a refresh of an old rec room to finishing bare concrete, these are the parts we plan and build.

We inspect walls, floor and corners for signs of water before planning anything, and tell you plainly what we find.

Straight, square walls with insulation suited to below-grade walls, so the room stays warm and comfortable.

Drywall, bulkheads around ducts and beams, and clean ceilings with pot lights where the layout allows.

Moisture-tolerant vinyl plank or tile laid over a properly prepared concrete floor.

A new or updated bathroom planned around existing plumbing rough-ins where possible, with plumbing done by licensed plumbers.

Doors, baseboards, stair finishing and paint, so the basement feels like part of the house.
Three common starting points. Your written estimate is based on your own basement.
| Option | What is included | Good for | Typical time on site |
|---|---|---|---|
| Refresh | New flooring, paint, lighting and trim in an already finished basement | Dated rec rooms that are structurally sound | 2 to 4 weeks |
| Finish an open basement | Framing, insulation, drywall, ceiling, flooring and finishing | Bare concrete basements with no moisture issues | 4 to 8 weeks, plus permit time |
| Full renovation | Everything above plus a bathroom, layout changes, egress windows or a legal second unit | Families who want an extra bathroom, guest room or rental suite | Planned at the estimate |
We will check your basement and talk through the options at a free visit.
Yes. The City of Kitchener requires a building permit for interior alterations, including partial and full basement finishing. The fee is $0.37 per square foot with a $95 minimum, plus a $250 rebate fee that is refunded when the final inspection passes. Inspections happen before walls are closed, so they are built into our schedule.
Seven clear steps, with one contact the whole way through.
We see the space and look for signs of water.
Room plan and full price in writing.
We prepare the drawings and help with the application, or you apply yourself.
Walls, insulation, electrical and plumbing roughed in.
City inspection before walls are closed.
Drywall, ceilings, flooring, trim and paint.
We check every detail and clean up.
A refresh of an already finished basement takes at least two to four weeks. Finishing bare concrete usually takes four to eight weeks, plus the time for permit review before we start and inspections before walls are closed. We give you a schedule with your estimate.
Permits in our area: Kitchener requires a permit for partial and full basement finishing. In Waterloo, you need one to finish an unfinished space, add or remove walls, change insulation, make structural changes, add or change plumbing, or create a second unit. See the City of Kitchener basement permit requirements or the City of Waterloo permit checklist.
Painting, new flooring or replacing trim in an already finished basement usually does not need a permit. Finishing bare space, new walls, insulation changes and plumbing do. Check the City of Kitchener permit guide or the City of Waterloo permit checklist. We confirm it with you at the estimate.
Local homeowners hire us for honest moisture advice, tidy work and basements that feel like part of the house.
We look for water before we build, because covering a damp wall only hides a bigger problem.
Framing, drywall, flooring and finishing coordinated by one team, so you never chase anyone.
The full scope and price in writing, explained point by point before work starts.
Dust control on the stairs and main floor, and a daily clean-up while we work.
Real reviews from Google and HomeStars.
“Oscar and Monica were fantastic to work with. They provided me with a free estimate and came out the following week to do the job. Oscar and his crew were very polite and knowledgeable.”
“They were super friendly and very specific when giving me the quote, they explained every detail of my renovation point by point. Their work team was very efficient.”
“Their skill, attention to detail, and overall workmanship really stood out throughout the entire process. The quality of the finished work exceeded our expectations.”
We renovate basements in Kitchener, Waterloo, Cambridge and Guelph, plus the towns nearby. Choosing a floor? See our flooring installation page, or our bathroom renovations if you are adding a basement bathroom.
Straight answers to common basement questions.
Yes. Kitchener requires a building permit for partial and full basement finishing. The fee is $0.37 per square foot with a $95 minimum, plus a $250 rebate fee refunded after the final inspection passes.
Waterloo requires a permit to finish an unfinished space, add or remove walls, change insulation type or value, make structural changes, add or change plumbing, or create a second unit.
It depends on the size, whether the basement is bare or already finished, any moisture work needed, and whether you add a bathroom. We give you a written estimate after a free visit.
A refresh takes at least two to four weeks. Finishing bare concrete takes four to eight weeks, plus permit review and inspections.
Yes. We build legal second units and install egress windows. A second unit needs a building permit, and we can prepare the drawings and help with the application.
Yes. We check for moisture before we build and handle waterproofing, or bring in a specialized waterproofing company when the job needs one.
Vinyl plank is a popular choice because it handles moisture better than laminate or hardwood. The concrete still has to be checked for moisture and flatness first.
Moisture has to be dealt with before finishing. We check for signs of water at the first visit and tell you plainly what we find.
Yes, often, especially if there is a plumbing rough-in already. Adding or changing plumbing needs a permit.
Yes. We work across Kitchener, Waterloo, Cambridge, Guelph, Hamilton, Stratford, New Hamburg and nearby communities, with no extra travel charge.
Tell us about your basement. We will call you back, visit, check the space and give you a clear written estimate with no obligation.
Request your free estimate
Tell us a little about the job. It takes under a minute.
Free, no-obligation estimate. We never share your details.